Sod Installation

SOD INSTALLATION IN THE INTERMOUNTAIN WEST AREA

Essential Tips For Installing Your New Sod

Laying sod correctly from the start helps ensure a healthy, long-lasting lawn. Follow these steps to install your sod efficiently and effectively.

  • If you are installing the sod in the heat of the day, lightly sprinkle your ground to cool off the surface. This way you are not laying the sod on a hot surface.
  • Begin installation immediately upon delivery. This will prevent the sod from drying out.
  • Start laying the sod along the longest straight line, such as a driveway, fence line, or sidewalk.
  • Butt the edges of the sod together tightly and without stretching. Be sure to avoid any overlapping or gaps.
  • Lay the sod in a “brick” pattern. Staggering the seams.
installing sod in your yard

Outstanding quality turf with dense grass development, far superior to the often half-dead grass from a “big box store.” Staff are courteous and helpful. They ask that you call ahead with square footage of what you will need so they can prepare the turf for you.

Joe S.

Hobbs was excellent to work with and delivered a quality product. The office was great and allowed me to add a half pallet last minute then texted me with a delivery time the night before. Great communication and excellent service.

Ashley A.

Installing Your Sod the Right Way

Proper installation is key to ensuring your new sod takes root quickly and grows into a healthy, lush lawn. Follow these steps to improve turf-to-soil contact, encourage deep rooting, and reduce the risk of sod stress during establishment.

Sod Installation Best Practices

  • Roll the area after installation to eliminate air pockets and ensure the sod makes full contact with the soil below.

  • Lay sod according to your sprinkler system zones if possible. This allows you to water each area immediately after installation—ideally within the first 30 minutes.

  • After completing the entire installation, thoroughly soak the sod until it feels soft and squishy underfoot.

  • Maintain soil moisture at a depth of 4–6 inches during the establishment period, typically lasting 2–3 weeks.

  • Limit foot traffic on your new lawn for the first few weeks to allow roots to establish without disruption.

mowing grass after sod installation

Great quality sod and professional staff. Highly recommend!

Alex

Ready to Order?

CALL US TODAY FOR A FREE QUOTE

Our primary phone line is temporarily unavailable. For immediate assistance, please call:

Idaho: (208) 646-2225 Cache Valley: (435) 753-1559 Utah: (435) 753-1559